DECORATING NHS FACILITIES
We were contracted with the full painting refurbishment of 33 hospital toilets and a children’s playroom, to bring the facilities back up to NHS standards. The work had to be completed within 12 working days, so we needed to work efficiently whilst maintaining attention to detail.
A full risk assessment, plus a health and safety briefing was required. We used Dulux materials and paints that were appropriate for use in a medical facility.
The project included full surface preparation, filling, sanding and applying caulk, followed by emulsion to all walls and woodwork. We applied two coats to the door frames for long-lasting and durable coverage.
Site visits were conducted throughout to ensure that the project was on track and delivered to the highest standard.